Prove performance
Fire & Smoke Modelling (CFD)
CFD fire and smoke modelling with FDS — proof of performance where prescriptive rules don't fit.
Discuss your projectProve performance
CFD fire and smoke modelling with FDS — proof of performance where prescriptive rules don't fit.
Discuss your projectAtriums, large halls and complex car parks often can't be solved with prescriptive rules alone. We model the fire and the resulting smoke movement with Fire Dynamics Simulator (FDS), zone or empirical models to show that conditions stay tenable long enough for people to escape — and document it for authority review.
Send drawings for a fee proposal
| Project | Client / via | Location | Scope |
|---|---|---|---|
| Mouwasat Hospital KhobarHealthcare | Al Khobar | Fire compartmentation review and inspection; atrium fire engineering analysis with CFD modelling. | |
| Mouwasat Hospital QatifHealthcare | Qatif | Fire compartmentation review and inspection; atrium fire engineering analysis with CFD modelling. | |
| Mouwasat Hospital RiyadhHealthcare | Sedar / Mouwasat | Riyadh | Review of fire zone drawings and materials; atrium fire engineering analysis with CFD modelling. |
| Mouwasat Hospital Madinah & LTCHealthcare | Mouwasat / Naffco | Madinah | Atrium CFD analysis; review of the smoke management design and fire compartmentation at the long-term care facility. |
| Sheraton Hotel & Convention CentreHospitality | Trane | Dammam | Fire safety review and design, smoke control system design and verification, CFD analysis. |
| Taif Inn Hotel (3 basements + ground + 10 floors)Hospitality | Ijada | Taif | Fire safety review, Civil Defence approval and CFD model for the atrium. |
Send us your drawings or tender documents. We reply within one working day.